Projects Wind
ARAUCO III Wind Farm
Extension of transformer station at Arauco I Wind Farm, stage 3.
Frequency converters for wind-powered generators. Manufacture and testing of the control system. Communication system.
Laying of...
See MoreVITORIA Wind Farm
Supervision system for three wind-powered generators of 1.5 MW with storage, alarm and event reporting, and data trend graphics. The SCADA also monitors variables of the meteorological...
See MoreBOM JARDIM Wind Farm
Supervision system for four wind farms divided as follows:
- Santo Antonio: two 1.5 MW wind-powered generators with storage, alarm and event reporting, and data trend graphics. The SCADA also...
See MoreLA GUAJIRA Wind Farm
Supervision system and Frequency converters of 12 wind-powered generators of 2.0MW.
The SCADA also monitors variables of the meteorological tower.
Location: Venezuela
Client: IMPSA Wind
See MoreEL JUME Wind Farm
Supervision system and Frequency converters of 4 wind-powered generators of 2.0MW.
The SCADA also monitors variables of the meteorological tower.
Location: Santiago del Estero,...
See MoreARAUCO Wind Farm
Transformer station for Arauco I Wind Farm. Design, calculation, construction, and erection of both civil and electromechanical works and installation of communication, protection, and control...
See MoreMORGADO Wind Farm
Supervision system for nineteen 1.5 MW wind-powered generators with storage, alarm and event reporting, and data trend graphics. The SCADA also monitors variables of the transformer substation and...
See MoreVOLTA DO RIO Wind Farm
Supervision system of twenty-eight 1.5 MW wind-powered generators with storage, alarm and event reporting, and data trend graphics. The SCADA also monitors variables of the transformer substation...
See MorePARAJURÚ Wind Farm
Supervision system of nineteen 1.5 MW wind-powered generators with storage, alarm and event reporting, and data trend graphics. The SCADA also monitors variables of the transformer substation and...
See More