Back
ALTO VALLE Thermal Power Plant
The scope of the supply includes the conduction of studies, analyses, calculations, modeling, sketches, drawings, and erection and the commissioning of field switches for the purpose of replacing switches present in two 15 MW Parsons generators.
Location: Neuquén, Argentina
Client: Cerros Colorados S.A.
